Muthuswamy, S., Vélez-Gallego, M. C., Maya, J., & Rojas-Santiago, M. (Nov 2012). Minimizing makespan in a two-machine no-wait flow shop with batch processing machines. The International Journal of Advanced Manufacturing Technology. https://doi.org/10.1007/s00170-012-3906-9
Copiado correctamente al portapapeles
Error al copiar al portapapeles
Cita Chicago Style (17a ed.)
Muthuswamy, Shanthi, Mario C. Vélez-Gallego, Jairo Maya, y Miguel Rojas-Santiago. "Minimizing Makespan in a Two-machine No-wait Flow Shop with Batch Processing Machines."
The International Journal of Advanced Manufacturing Technology Nov 2012. https://doi.org/10.1007/s00170-012-3906-9.
Copiado correctamente al portapapeles
Error al copiar al portapapeles
Cita MLA (9a ed.)
Muthuswamy, Shanthi, et al. "Minimizing Makespan in a Two-machine No-wait Flow Shop with Batch Processing Machines."
The International Journal of Advanced Manufacturing Technology, Nov 2012, https://doi.org/10.1007/s00170-012-3906-9.
Copiado correctamente al portapapeles
Error al copiar al portapapeles
Precaución: Estas citas no son 100% exactas.