Kurniawan, D., Yusriski, R., Isnaini, M. M., Ma'ruf, A., & Halim, A. H. (2024). A flow shop batch scheduling model with pre-processing and time-changing effects to minimize total actual flow time. Journal of Industrial Engineering and Management. https://doi.org/10.3926/jiem.7134
Copiat
No s'ha pogut copiar
Cita Chicago (17th ed.)
Kurniawan, Dwi, Rinto Yusriski, Mohammad Mi'radj Isnaini, Anas Ma'ruf, i Abdul Hakim Halim. "A Flow Shop Batch Scheduling Model with Pre-processing and Time-changing Effects to Minimize Total Actual Flow Time."
Journal of Industrial Engineering and Management 2024. https://doi.org/10.3926/jiem.7134.
Copiat
No s'ha pogut copiar
Cita MLA (9th ed.)
Kurniawan, Dwi, et al. "A Flow Shop Batch Scheduling Model with Pre-processing and Time-changing Effects to Minimize Total Actual Flow Time."
Journal of Industrial Engineering and Management, 2024, https://doi.org/10.3926/jiem.7134.
Copiat
No s'ha pogut copiar
Atenció: Aquestes cites poden no estar 100% correctes.