Zhao, Y., Du, S., Tu, M., Ma, H., Shang, J., & Xiang, X. (2025). Multi-Objective Scheduling Optimization of Prefabricated Components Production Using Improved Non-Dominated Sorting Generic Algorithm II. Buildings. https://doi.org/10.3390/buildings15050742
Copiado correctamente al portapapeles
Error al copiar al portapapeles
Cita Chicago Style (17a ed.)
Zhao, Yishi, Shaokang Du, Ming Tu, Haichuan Ma, Jianga Shang, y Xiuqiao Xiang. "Multi-Objective Scheduling Optimization of Prefabricated Components Production Using Improved Non-Dominated Sorting Generic Algorithm II."
Buildings 2025. https://doi.org/10.3390/buildings15050742.
Copiado correctamente al portapapeles
Error al copiar al portapapeles
Cita MLA (9a ed.)
Zhao, Yishi, et al. "Multi-Objective Scheduling Optimization of Prefabricated Components Production Using Improved Non-Dominated Sorting Generic Algorithm II."
Buildings, 2025, https://doi.org/10.3390/buildings15050742.
Copiado correctamente al portapapeles
Error al copiar al portapapeles
Precaución: Estas citas no son 100% exactas.