Wei, J., Liu, Y., Lu, X., Zhao, R., & Wang, G. (2025). Dynamic Optimization of Tunnel Construction Scheduling in a Reverse Construction Scenario. Systems. https://doi.org/10.3390/systems13030168
Copiado correctamente al portapapeles
Error al copiar al portapapeles
Cita Chicago Style (17a ed.)
Wei, Jianying, Yuming Liu, Xiaochun Lu, Rong Zhao, y Gan Wang. "Dynamic Optimization of Tunnel Construction Scheduling in a Reverse Construction Scenario."
Systems 2025. https://doi.org/10.3390/systems13030168.
Copiado correctamente al portapapeles
Error al copiar al portapapeles
Cita MLA (9a ed.)
Wei, Jianying, et al. "Dynamic Optimization of Tunnel Construction Scheduling in a Reverse Construction Scenario."
Systems, 2025, https://doi.org/10.3390/systems13030168.
Copiado correctamente al portapapeles
Error al copiar al portapapeles
אזהרה: ציטוטים אלה לעיתים לא מדויקים ב 100%.