Cita APA (7a ed.)
Yang, S., Meng, L., Ullah, S., Zhang, C., Sang, H., & Zhang, B. (Dec 2025). MILP Modeling and Optimization of Three-Stage Flexible Job Shop Scheduling Problem with Assembly and AGV Transportation. Chinese Journal of Mechanical Engineering = Ji xie gong cheng xue bao. https://doi.org/10.1186/s10033-025-01281-z
Cita Chicago Style (17a ed.)
Yang, Shiming, Leilei Meng, Saif Ullah, Chaoyong Zhang, Hongyan Sang, y Biao Zhang. "MILP Modeling and Optimization of Three-Stage Flexible Job Shop Scheduling Problem with Assembly and AGV Transportation." Chinese Journal of Mechanical Engineering = Ji Xie Gong Cheng Xue Bao Dec 2025. https://doi.org/10.1186/s10033-025-01281-z.
Cita MLA (9a ed.)
Yang, Shiming, et al. "MILP Modeling and Optimization of Three-Stage Flexible Job Shop Scheduling Problem with Assembly and AGV Transportation." Chinese Journal of Mechanical Engineering = Ji Xie Gong Cheng Xue Bao, Dec 2025, https://doi.org/10.1186/s10033-025-01281-z.
Advarsel: Disse citationer er muligvist ikke 100% nøjagtige.