Cita APA (7a ed.)
Wenliang, Z., Addishiwot, A., & Mehdi, O. (2025). A Synchronized Optimization Method of Frequency Setting, Timetabling, and Train Circulation Planning for URT Networks with Overlapping Lines: A Case Study of the Addis Ababa Light Rail Transit Service. Mathematics. https://doi.org/10.3390/math13162654
Cita Chicago Style (17a ed.)
Wenliang, Zhou, Alemu Addishiwot, y Oldache Mehdi. "A Synchronized Optimization Method of Frequency Setting, Timetabling, and Train Circulation Planning for URT Networks with Overlapping Lines: A Case Study of the Addis Ababa Light Rail Transit Service." Mathematics 2025. https://doi.org/10.3390/math13162654.
Cita MLA (9a ed.)
Wenliang, Zhou, et al. "A Synchronized Optimization Method of Frequency Setting, Timetabling, and Train Circulation Planning for URT Networks with Overlapping Lines: A Case Study of the Addis Ababa Light Rail Transit Service." Mathematics, 2025, https://doi.org/10.3390/math13162654.
Precaución: Estas citas no son 100% exactas.