Cita APA (7a ed.)
(Jan 5, 2026). The Project Involves The Supply, Installation, Testing, And Commissioning Of Function Generators And Related Equipment For Defense Applications. Function Generator, Power Generator - Dg Set (up To 900 Kva), Multi Function Calibrators, Multi Function Meter. MENA Report.
Cita Chicago Style (17a ed.)
"The Project Involves The Supply, Installation, Testing, And Commissioning Of Function Generators And Related Equipment For Defense Applications. Function Generator, Power Generator - Dg Set (up To 900 Kva), Multi Function Calibrators, Multi Function Meter." MENA Report Jan 5, 2026.
Cita MLA (9a ed.)
"The Project Involves The Supply, Installation, Testing, And Commissioning Of Function Generators And Related Equipment For Defense Applications. Function Generator, Power Generator - Dg Set (up To 900 Kva), Multi Function Calibrators, Multi Function Meter." MENA Report, Jan 5, 2026.
אזהרה: ציטוטים אלה לעיתים לא מדויקים ב 100%.