Integrated Risk Analysis for a Commercial Computing Service in Utility Computing

Đã lưu trong:
Chi tiết về thư mục
Xuất bản năm:Journal of Grid Computing vol. 7, no. 1 (Mar 2009), p. 1
Tác giả chính: Chee Shin Yeo
Tác giả khác: Buyya, Rajkumar
Được phát hành:
Springer Nature B.V.
Những chủ đề:
Truy cập trực tuyến:Citation/Abstract
Full Text - PDF
Các nhãn: Thêm thẻ
Không có thẻ, Là người đầu tiên thẻ bản ghi này!

MARC

LEADER 00000nab a2200000uu 4500
001 2259769028
003 UK-CbPIL
022 |a 1570-7873 
022 |a 1572-9184 
024 7 |a 10.1007/s10723-008-9103-2  |2 doi 
035 |a 2259769028 
045 2 |b d20090301  |b d20090331 
100 1 |a Chee Shin Yeo  |u Grid Computing and Distributed Systems Laboratory, Department of Computer Science and Software Engineering, The University of Melbourne, Melbourne, Victoria, Australia 
245 1 |a Integrated Risk Analysis for a Commercial Computing Service in Utility Computing 
260 |b Springer Nature B.V.  |c Mar 2009 
513 |a Journal Article 
520 3 |a Recent technological advances in Grid computing enable the virtualization and dynamic delivery of computing services on demand to realize utility computing. In utility computing, computing services will always be available to the users whenever the need arises, similar to the availability of real-world utilities, such as electrical power, gas, and water. With this new outsourcing service model, users are able to define their service needs through Service Level Agreements (SLAs) and only have to pay when they use the services. They do not have to invest on or maintain computing infrastructures themselves and are not constrained to specific computing service providers. Thus, a commercial computing service will face two new challenges: (i) what are the objectives or goals it needs to achieve in order to support the utility computing model, and (ii) how to evaluate whether these objectives are achieved or not. To address these two new challenges, this paper first identifies four essential objectives that are required to support the utility computing model: (i) manage wait time for SLA acceptance, (ii) meet SLA requests, (iii) ensure reliability of accepted SLA, and (iv) attain profitability. It then describes two evaluation methods that are simple and intuitive: (i) separate and (ii) integrated risk analysis to analyze the effectiveness of resource management policies in achieving the objectives. Evaluation results based on simulation successfully demonstrate the applicability of separate and integrated risk analysis to assess policies in terms of the objectives. These evaluation results which constitute an a posteriori risk analysis of policies can later be used to generate an a priori risk analysis of policies by identifying possible risks for future utility computing situations. 
653 |a Electric utilities 
653 |a Utility computing 
653 |a Objectives 
653 |a Resource management 
653 |a Risk analysis 
653 |a Water utilities 
653 |a Computational grids 
653 |a Computer simulation 
653 |a Profitability 
653 |a Policies 
700 1 |a Buyya, Rajkumar  |u Grid Computing and Distributed Systems Laboratory, Department of Computer Science and Software Engineering, The University of Melbourne, Melbourne, Victoria, Australia 
773 0 |t Journal of Grid Computing  |g vol. 7, no. 1 (Mar 2009), p. 1 
786 0 |d ProQuest  |t Advanced Technologies & Aerospace Database 
856 4 1 |3 Citation/Abstract  |u https://www.proquest.com/docview/2259769028/abstract/embedded/7BTGNMKEMPT1V9Z2?source=fedsrch 
856 4 0 |3 Full Text - PDF  |u https://www.proquest.com/docview/2259769028/fulltextPDF/embedded/7BTGNMKEMPT1V9Z2?source=fedsrch