Heuristics to minimize makespan of parallel batch processing machines

Guardat en:
Dades bibliogràfiques
Publicat a:The International Journal of Advanced Manufacturing Technology vol. 37, no. 9-10 (Jun 2008), p. 1005
Autor principal: Damodaran, Purushothaman
Altres autors: Ping-Yu, Chang
Publicat:
Springer Nature B.V.
Matèries:
Accés en línia:Citation/Abstract
Full Text - PDF
Etiquetes: Afegir etiqueta
Sense etiquetes, Sigues el primer a etiquetar aquest registre!

MARC

LEADER 00000nab a2200000uu 4500
001 2262477074
003 UK-CbPIL
022 |a 0268-3768 
022 |a 1433-3015 
024 7 |a 10.1007/s00170-007-1042-8  |2 doi 
035 |a 2262477074 
045 2 |b d20080601  |b d20080630 
100 1 |a Damodaran, Purushothaman  |u Department of Industrial and Systems Engineering, Florida International University, Miami, FL, USA 
245 1 |a Heuristics to minimize makespan of parallel batch processing machines 
260 |b Springer Nature B.V.  |c Jun 2008 
513 |a Journal Article 
520 3 |a Batch-processing machines can process several jobs simultaneously. These machines are commonly used to test Printed Circuit Boards (PCBs). The processing time and the dimensions of the PCB are given. Each batch is formed such that the total size of all the PCBs in the batch does not exceed the machine capacity. The batch processing time is equal to the longest processing time of all the PCBs in the batch. These batch processing machines are expensive and a bottleneck. Scheduling PCBs on these parallel batch processing machines to minimize their makespan is NP-hard. Consequently, we propose several heuristics. The performance of the proposed heuristics is compared to a simulated annealing approach and a commercial solver. 
653 |a Printed circuits 
653 |a Production scheduling 
653 |a Batch processing 
653 |a Simulated annealing 
653 |a Heuristic 
653 |a Circuit boards 
700 1 |a Ping-Yu, Chang  |u Department of Industrial Engineering and Management, Mingchi University of Technology, Taipei, Taiwan 
773 0 |t The International Journal of Advanced Manufacturing Technology  |g vol. 37, no. 9-10 (Jun 2008), p. 1005 
786 0 |d ProQuest  |t Engineering Database 
856 4 1 |3 Citation/Abstract  |u https://www.proquest.com/docview/2262477074/abstract/embedded/L8HZQI7Z43R0LA5T?source=fedsrch 
856 4 0 |3 Full Text - PDF  |u https://www.proquest.com/docview/2262477074/fulltextPDF/embedded/L8HZQI7Z43R0LA5T?source=fedsrch