Scheduling Jobs with Work-Inefficient Parallel Solutions

Guardado en:
Detalles Bibliográficos
Publicado en:arXiv.org (May 20, 2024), p. n/a
Autor principal: Kuszmaul, William
Otros Autores: Westover, Alek
Publicado:
Cornell University Library, arXiv.org
Materias:
Acceso en línea:Citation/Abstract
Full text outside of ProQuest
Etiquetas: Agregar Etiqueta
Sin Etiquetas, Sea el primero en etiquetar este registro!

MARC

LEADER 00000nab a2200000uu 4500
001 3057537846
003 UK-CbPIL
022 |a 2331-8422 
035 |a 3057537846 
045 0 |b d20240520 
100 1 |a Kuszmaul, William 
245 1 |a Scheduling Jobs with Work-Inefficient Parallel Solutions 
260 |b Cornell University Library, arXiv.org  |c May 20, 2024 
513 |a Working Paper 
520 3 |a This paper introduces the \emph{serial-parallel decision problem}. Consider an online scheduler that receives a series of tasks, where each task has both a parallel and a serial implementation. The parallel implementation has the advantage that it can make progress concurrently on multiple processors, but the disadvantage that it is (potentially) work-inefficient. As tasks arrive, the scheduler must decide for each task which implementation to use. We begin by studying \emph{total awake time}. We give a simple \emph{decide-on-arrival} scheduler that achieves a competitive ratio of \(3\) for total awake time -- this scheduler makes serial/parallel decisions immediately when jobs arrive. Our second result is an \emph{parallel-work-oblivious} scheduler that achieves a competitive ratio of \(6\) for total awake time -- this scheduler makes all of its decisions based only on the size of each serial job and without needing to know anything about the parallel implementations. Finally, we prove a lower bound showing that, if a scheduler wishes to achieve a competitive ratio of \(O(1)\), it can have at most one of the two aforementioned properties (decide-on-arrival or parallel-work-oblivious). We also prove lower bounds of the form \(1 + \Omega(1)\) on the optimal competitive ratio for any scheduler. Next, we turn our attention to optimizing \emph{mean response time}. Here, we show that it is possible to achieve an \(O(1)\) competitive ratio with \(O(1)\) speed augmentation. This is the most technically involved of our results. We also prove that, in this setting, it is not possible for a parallel-work-oblivious scheduler to do well. In addition to these results, we present tight bounds on the optimal competitive ratio if we allow for arrival dependencies between tasks (e.g., tasks are components of a single parallel program), and we give an in-depth discussion of the remaining open questions. 
653 |a Lower bounds 
653 |a Task scheduling 
653 |a Parallel programming 
653 |a Computer aided scheduling 
653 |a Employment 
653 |a Decisions 
653 |a Optimization 
653 |a Competition 
700 1 |a Westover, Alek 
773 0 |t arXiv.org  |g (May 20, 2024), p. n/a 
786 0 |d ProQuest  |t Engineering Database 
856 4 1 |3 Citation/Abstract  |u https://www.proquest.com/docview/3057537846/abstract/embedded/7BTGNMKEMPT1V9Z2?source=fedsrch 
856 4 0 |3 Full text outside of ProQuest  |u http://arxiv.org/abs/2405.11986