Automatic Planning Method of Construction Schedule under Multi-Dimensional Spatial Resource Constraints

-д хадгалсан:
Номзүйн дэлгэрэнгүй
-д хэвлэсэн:Buildings vol. 14, no. 10 (2024), p. 3231
Үндсэн зохиолч: Wang, Luqi
Бусад зохиолчид: Li, Jinrui, Ye, Qizhi, Li, Yan, Feng, Anqi
Хэвлэсэн:
MDPI AG
Нөхцлүүд:
Онлайн хандалт:Citation/Abstract
Full Text + Graphics
Full Text - PDF
Шошгууд: Шошго нэмэх
Шошго байхгүй, Энэхүү баримтыг шошголох эхний хүн болох!
Тодорхойлолт
Хураангуй:To enhance the application of building information modeling (BIM) in schedule management for engineering projects, improve spatial planning capabilities, and minimize subjective factors in schedule preparation, this paper presents a framework and method for automatic construction schedule planning based on BIM and data-driven approaches under multi-dimensional spatial resource constraints. The method includes data acquisition, construction process reasoning, time parameter calculation, and schedule generation and scheduling. Initially, the construction data from the BIM model and manual input are imported into the reasoning system to establish the logical relationships of the construction process. Construction time parameters and spatial resource requirements are then automatically calculated using MySQL. Subsequently, the spatial layout and resource allocation data exported from the BIM model are compared to assess whether the space meets the project requirements. Finally, a construction schedule that satisfies the space constraints is generated. The method was validated through a case study, demonstrating its effectiveness in automatic schedule planning under human-computer interaction. This study introduces an innovative approach that considers spatial conflicts in the automatic scheduling process, improving planning efficiency and reducing the risk of spatial conflicts on construction sites.
ISSN:2075-5309
DOI:10.3390/buildings14103231
Эх сурвалж:Engineering Database