Dan, Y., Sun, C., & Luo, Q. (2025). Integrated Scheduling Optimization for Multi-Line Production and Transportation of Prefabricated Components Considering Shared Resources. Buildings. https://doi.org/10.3390/buildings15020187
Copiat
No s'ha pogut copiar
Cita Chicago (17th ed.)
Dan, Yiran, Chengshuang Sun, i Qianmai Luo. "Integrated Scheduling Optimization for Multi-Line Production and Transportation of Prefabricated Components Considering Shared Resources."
Buildings 2025. https://doi.org/10.3390/buildings15020187.
Copiat
No s'ha pogut copiar
Cita MLA (9th ed.)
Dan, Yiran, et al. "Integrated Scheduling Optimization for Multi-Line Production and Transportation of Prefabricated Components Considering Shared Resources."
Buildings, 2025, https://doi.org/10.3390/buildings15020187.
Copiat
No s'ha pogut copiar
Atenció: Aquestes cites poden no estar 100% correctes.