Integrated Scheduling Optimization for Multi-Line Production and Transportation of Prefabricated Components Considering Shared Resources

Salvato in:
Dettagli Bibliografici
Pubblicato in:Buildings vol. 15, no. 2 (2025), p. 187
Autore principale: Yiran Dan
Altri autori: Sun, Chengshuang, Luo, Qianmai
Pubblicazione:
MDPI AG
Soggetti:
Accesso online:Citation/Abstract
Full Text + Graphics
Full Text - PDF
Tags: Aggiungi Tag
Nessun Tag, puoi essere il primo ad aggiungerne!!

MARC

LEADER 00000nab a2200000uu 4500
001 3159462512
003 UK-CbPIL
022 |a 2075-5309 
024 7 |a 10.3390/buildings15020187  |2 doi 
035 |a 3159462512 
045 2 |b d20250101  |b d20251231 
084 |a 231437  |2 nlm 
100 1 |a Yiran Dan 
245 1 |a Integrated Scheduling Optimization for Multi-Line Production and Transportation of Prefabricated Components Considering Shared Resources 
260 |b MDPI AG  |c 2025 
513 |a Journal Article 
520 3 |a With the increasing popularity of prefabricated buildings, more and more precast plants have been equipped with multiple production lines to increase productivity and meet the growing market demand. Sharing equipment, human, and transportation resources is a typical feature of integrated scheduling management for precast production and transportation on multiple production lines. In response to these characteristics, this article studies the integrated scheduling optimization of multi-line production and transportation for prefabricated components. With on-time delivery and lower costs as the goals, a scheduling optimization mathematical model is established for this scenario. This article adopts the genetic algorithm to design the solution algorithm for this model, and the effectiveness of the model and algorithm is verified through an example. The results show that compared with the traditional scheduling scheme, this method can prominently reduce costs while promoting on-time delivery. The model and method can help the precast plant with multiple production lines improve efficiency and reduce costs, as well as enhancing the practicability of the precast production and transportation scheduling scheme. 
651 4 |a China 
653 |a Prefabricated buildings 
653 |a Scheduling 
653 |a Assembly lines 
653 |a Genetic algorithms 
653 |a Algorithms 
653 |a Costs 
653 |a Production lines 
653 |a Optimization 
653 |a Production scheduling 
653 |a Delivery scheduling 
653 |a Resource scheduling 
653 |a Job shops 
653 |a Construction industry 
653 |a Design optimization 
653 |a Energy consumption 
653 |a Mathematical models 
700 1 |a Sun, Chengshuang 
700 1 |a Luo, Qianmai 
773 0 |t Buildings  |g vol. 15, no. 2 (2025), p. 187 
786 0 |d ProQuest  |t Engineering Database 
856 4 1 |3 Citation/Abstract  |u https://www.proquest.com/docview/3159462512/abstract/embedded/6A8EOT78XXH2IG52?source=fedsrch 
856 4 0 |3 Full Text + Graphics  |u https://www.proquest.com/docview/3159462512/fulltextwithgraphics/embedded/6A8EOT78XXH2IG52?source=fedsrch 
856 4 0 |3 Full Text - PDF  |u https://www.proquest.com/docview/3159462512/fulltextPDF/embedded/6A8EOT78XXH2IG52?source=fedsrch