Solving Flexible Job-Shop Scheduling Problems Based on Quantum Computing
Збережено в:
| Опубліковано в:: | Entropy vol. 27, no. 2 (2025), p. 189 |
|---|---|
| Автор: | |
| Інші автори: | , , |
| Опубліковано: |
MDPI AG
|
| Предмети: | |
| Онлайн доступ: | Citation/Abstract Full Text + Graphics Full Text - PDF |
| Теги: |
Немає тегів, Будьте першим, хто поставить тег для цього запису!
|
MARC
| LEADER | 00000nab a2200000uu 4500 | ||
|---|---|---|---|
| 001 | 3170909607 | ||
| 003 | UK-CbPIL | ||
| 022 | |a 1099-4300 | ||
| 024 | 7 | |a 10.3390/e27020189 |2 doi | |
| 035 | |a 3170909607 | ||
| 045 | 2 | |b d20250101 |b d20251231 | |
| 084 | |a 231460 |2 nlm | ||
| 100 | 1 | |a Fu, Kaihan | |
| 245 | 1 | |a Solving Flexible Job-Shop Scheduling Problems Based on Quantum Computing | |
| 260 | |b MDPI AG |c 2025 | ||
| 513 | |a Journal Article | ||
| 520 | 3 | |a Flexible job-shop scheduling problems (FJSPs) represent one of the most complex combinatorial optimization challenges. Modern production systems and control processes demand rapid decision-making in scheduling. To address this challenge, we propose a quantum computing approach for solving FJSPs. We propose a quadratic unconstrained binary optimization (QUBO) model to minimize the makespan of FJSPs, with the scheduling scheme encoded in the ground state of the Hamiltonian operator. The model is solved using a coherent Ising machine (CIM). Numerical experiments are conducted to evaluate and validate the performance and effectiveness of the CIM. The results demonstrate that quantum computing holds significant potential for solving FJSPs more efficiently than traditional computational methods. | |
| 653 | |a Scheduling | ||
| 653 | |a Quantum computing | ||
| 653 | |a Integer programming | ||
| 653 | |a Computers | ||
| 653 | |a Mathematical models | ||
| 653 | |a Combinatorial analysis | ||
| 653 | |a Optimization | ||
| 653 | |a Flexibility | ||
| 653 | |a Variables | ||
| 653 | |a Manufacturers | ||
| 653 | |a Ising model | ||
| 653 | |a Linear programming | ||
| 653 | |a Manufacturing | ||
| 653 | |a Feedback | ||
| 653 | |a Energy consumption | ||
| 653 | |a Job shop scheduling | ||
| 700 | 1 | |a Liu, Jianjun | |
| 700 | 1 | |a Chen, Miao | |
| 700 | 1 | |a Zhang, Huiying | |
| 773 | 0 | |t Entropy |g vol. 27, no. 2 (2025), p. 189 | |
| 786 | 0 | |d ProQuest |t Engineering Database | |
| 856 | 4 | 1 | |3 Citation/Abstract |u https://www.proquest.com/docview/3170909607/abstract/embedded/6A8EOT78XXH2IG52?source=fedsrch |
| 856 | 4 | 0 | |3 Full Text + Graphics |u https://www.proquest.com/docview/3170909607/fulltextwithgraphics/embedded/6A8EOT78XXH2IG52?source=fedsrch |
| 856 | 4 | 0 | |3 Full Text - PDF |u https://www.proquest.com/docview/3170909607/fulltextPDF/embedded/6A8EOT78XXH2IG52?source=fedsrch |