Research on Parametric Modeling and Model Transformation of Proton Hospital Based on BIM

Guardat en:
Dades bibliogràfiques
Publicat a:Buildings vol. 15, no. 10 (2025), p. 1658
Autor principal: Li Shoufu
Altres autors: Yu, Tao, Liu, Yang, Li, Yan, Lei, Bo, Qiao Wenjing, Zhang, Yuyan
Publicat:
MDPI AG
Matèries:
Accés en línia:Citation/Abstract
Full Text + Graphics
Full Text - PDF
Etiquetes: Afegir etiqueta
Sense etiquetes, Sigues el primer a etiquetar aquest registre!

MARC

LEADER 00000nab a2200000uu 4500
001 3211922112
003 UK-CbPIL
022 |a 2075-5309 
024 7 |a 10.3390/buildings15101658  |2 doi 
035 |a 3211922112 
045 2 |b d20250101  |b d20251231 
084 |a 231437  |2 nlm 
100 1 |a Li Shoufu  |u China Construction Third Engineering Bureau Group Co., Ltd., Wuhan 430000, China; w174172@163.com (S.L.); w174172@outlook.com (T.Y.); 13951458188@163.com (Y.L.); 15343837402@163.com (Y.L.); 13849154365@163.com (B.L.) 
245 1 |a Research on Parametric Modeling and Model Transformation of Proton Hospital Based on BIM 
260 |b MDPI AG  |c 2025 
513 |a Journal Article 
520 3 |a Aiming at problems such as difficulty and low efficiency in modeling complex building structures in Revit and Abaqus, Revit and Dynamo visual programming modeling were used to realize rapid parametric modeling of structures, and a Revit–Abaqus model conversion interface was developed. Based on Revit’s API modeling function and Dynamo’s visual programming function, a proton hospital structure model was quickly created, secondary development of Revit conducted on Visual Studio 2022 using C# language, the Revit model exported to a single unified management .sat file, and a corresponding Python script file conforming to Abaqus generated. The script file contained all the .sat file path and parameter information to realize the conversion of the BIM model to Abaqus 2020 finite element software. The proposed modeling method can effectively expand the application range of BIM in a proton hospital project and effectively improve the efficiency of BIM modeling technology. The Revit–Abaqus model conversion interface developed can realize the automatic conversion of a BIM model to a structural analysis model. Compared with the traditional finite element modeling method, this effectively improves the modeling efficiency of structural analysis of proton hospital engineering and makes up for the shortcomings of BIM technology in structural analysis of proton hospital construction. 
653 |a Finite element method 
653 |a Design optimization 
653 |a Software 
653 |a Programming languages 
653 |a Visual perception 
653 |a Collaboration 
653 |a Application programming interface 
653 |a Protons 
653 |a Concrete 
653 |a Hospitals 
653 |a Structural analysis 
653 |a Efficiency 
653 |a Mathematical models 
653 |a Engineering 
653 |a Construction industry 
653 |a Visual programming languages 
653 |a Automation 
653 |a Radiation therapy 
653 |a Building information modeling 
653 |a Hospital engineering 
700 1 |a Yu, Tao  |u China Construction Third Engineering Bureau Group Co., Ltd., Wuhan 430000, China; w174172@163.com (S.L.); w174172@outlook.com (T.Y.); 13951458188@163.com (Y.L.); 15343837402@163.com (Y.L.); 13849154365@163.com (B.L.) 
700 1 |a Liu, Yang  |u China Construction Third Engineering Bureau Group Co., Ltd., Wuhan 430000, China; w174172@163.com (S.L.); w174172@outlook.com (T.Y.); 13951458188@163.com (Y.L.); 15343837402@163.com (Y.L.); 13849154365@163.com (B.L.) 
700 1 |a Li, Yan  |u China Construction Third Engineering Bureau Group Co., Ltd., Wuhan 430000, China; w174172@163.com (S.L.); w174172@outlook.com (T.Y.); 13951458188@163.com (Y.L.); 15343837402@163.com (Y.L.); 13849154365@163.com (B.L.) 
700 1 |a Lei, Bo  |u China Construction Third Engineering Bureau Group Co., Ltd., Wuhan 430000, China; w174172@163.com (S.L.); w174172@outlook.com (T.Y.); 13951458188@163.com (Y.L.); 15343837402@163.com (Y.L.); 13849154365@163.com (B.L.) 
700 1 |a Qiao Wenjing  |u Civil & Architecture Engineering, Xi’an Technological University, Xuefuzhonglu Avenue, Weiyang District, Xi’an 710021, China; zhangyuyan@st.xatu.edu.cn 
700 1 |a Zhang, Yuyan  |u Civil & Architecture Engineering, Xi’an Technological University, Xuefuzhonglu Avenue, Weiyang District, Xi’an 710021, China; zhangyuyan@st.xatu.edu.cn 
773 0 |t Buildings  |g vol. 15, no. 10 (2025), p. 1658 
786 0 |d ProQuest  |t Engineering Database 
856 4 1 |3 Citation/Abstract  |u https://www.proquest.com/docview/3211922112/abstract/embedded/L8HZQI7Z43R0LA5T?source=fedsrch 
856 4 0 |3 Full Text + Graphics  |u https://www.proquest.com/docview/3211922112/fulltextwithgraphics/embedded/L8HZQI7Z43R0LA5T?source=fedsrch 
856 4 0 |3 Full Text - PDF  |u https://www.proquest.com/docview/3211922112/fulltextPDF/embedded/L8HZQI7Z43R0LA5T?source=fedsrch