A Three-Machine Flowshop Scheduling Problem with Linear Fatigue Effect
Spremljeno u:
| Izdano u: | Mathematics vol. 13, no. 22 (2025), p. 3670-3696 |
|---|---|
| Glavni autor: | |
| Daljnji autori: | , , , , , , , , |
| Izdano: |
MDPI AG
|
| Teme: | |
| Online pristup: | Citation/Abstract Full Text + Graphics Full Text - PDF |
| Oznake: |
Bez oznaka, Budi prvi tko označuje ovaj zapis!
|
| Sažetak: | Highly customized requirements in smart manufacturing result in the unavoidable manual execution of complex operational procedures. Physical and mental fatigue from long work periods for assembly-line operators induces production issues, such as defective work-in-processes or equipment failure. An effective production schedule should account for worker fatigue. This study investigates a three-machine flowshop scheduling problem with the objective of makespan minimization, in which a linear fatigue effect function provides an approximate mathematical representation of fatigue and recovery processes in workers. A mixed integer programming (MIP) model is developed to optimize the integration of automated and human-operated production in manufacturing systems. Given its NP-hardness, an improved tabu search (ITS) algorithm is designed to obtain high-quality solutions, incorporating multiple initial solutions, a well-designed encoding-decoding strategy, and a tabu-based adaptive search mechanism to enhance efficiency. Numerical simulations indicate the veracity of the MIP model and the effectiveness of the ITS algorithm. |
|---|---|
| ISSN: | 2227-7390 |
| Digitalni identifikator objekta: | 10.3390/math13223670 |
| Izvor: | Engineering Database |