Genetic algorithms for minimizing makespan in a flow shop with two capacitated batch processing machines

Gespeichert in:
Bibliographische Detailangaben
Veröffentlicht in:The International Journal of Advanced Manufacturing Technology vol. 55, no. 9-12 (Aug 2011), p. 1171
1. Verfasser: Manjeshwar, Praveen Kumar
Weitere Verfasser: Damodaran, Purushothaman, Krishnaswami Srihari
Veröffentlicht:
Springer Nature B.V.
Schlagworte:
Online-Zugang:Citation/Abstract
Full Text - PDF
Tags: Tag hinzufügen
Keine Tags, Fügen Sie das erste Tag hinzu!
Beschreibung
Abstract:This paper considers a flow shop with two batch processing machines. The processing times of the job and their sizes are given. The batch processing machines can process multiple jobs simultaneously in a batch as long as the total size of all the jobs in a batch does not exceed its capacity. When the jobs are grouped into batches, the processing time of the batch is defined by the longest processing job in the batch. Batch processing machines are expensive and a bottleneck. Consequently, the objective is to minimize the makespan (or maximize the machine utilization). The scheduling problem under study is NP-hard, hence, a genetic algorithm (GA) is proposed. The effectiveness (in terms of solution quality and run time) of the GA approach is compared with a simulated annealing approach, a heuristic, and a commercial solver which was used to solve a mixed-integer formulation of the problem. Experimental study indicates that the GA approach outperforms the other approaches by reporting better solution.
ISSN:0268-3768
1433-3015
DOI:10.1007/s00170-010-3150-0
Quelle:Engineering Database