A flow shop batch scheduling model with pre-processing and time-changing effects to minimize total actual flow time
Guardat en:
| Publicat a: | Journal of Industrial Engineering and Management vol. 17, no. 2 (2024), p. 542 |
|---|---|
| Autor principal: | |
| Altres autors: | , , , |
| Publicat: |
Vicenc Fernandez
|
| Matèries: | |
| Accés en línia: | Citation/Abstract Full Text - PDF |
| Etiquetes: |
Sense etiquetes, Sigues el primer a etiquetar aquest registre!
|
MARC
| LEADER | 00000nab a2200000uu 4500 | ||
|---|---|---|---|
| 001 | 3085231130 | ||
| 003 | UK-CbPIL | ||
| 022 | |a 2013-8423 | ||
| 022 | |a 2013-0953 | ||
| 024 | 7 | |a 10.3926/jiem.7134 |2 doi | |
| 035 | |a 3085231130 | ||
| 045 | 2 | |b d20240101 |b d20241231 | |
| 084 | |a 155729 |2 nlm | ||
| 100 | 1 | |a Kurniawan, Dwi | |
| 245 | 1 | |a A flow shop batch scheduling model with pre-processing and time-changing effects to minimize total actual flow time | |
| 260 | |b Vicenc Fernandez |c 2024 | ||
| 513 | |a Journal Article | ||
| 520 | 3 | |a Purpose: This paper investigates a batch scheduling problem where pre-processing is required for parts before processing, considering time-changing effects from part deterioration and operator learning-forgetting.Design/methodology/approach: A mathematical model was developed with the decision variables of the number of batches, the number of pre-processings, batch sizes, and the schedule of processes and pre-processings to minimize total actual flow time. Different numbers of batches were gradually tried and increased until the objective function stopped improving. The minimum number of pre-processings that resulted in a feasible solution was examined at each number of batches.Findings:Our experiment showed that: (1) A faster operator learning led to a lower optimal number of batches and a lower total actual flow time, (2) A faster part deterioration brought a higher number of batches and a higher total actual flow time, (3) The model minimized the number of pre-processings by only scheduling pre-processings before the operations at machine 1, and (4) The model divided the parts into small batches to prevent increased processing time due to part deterioration.Research limitations: The research did not consider multi-due date and multi-item system which require pre-processings with different times and capacities.Practical implications: Production managers should assign fast learning operators to shorter batches and faster deteriorating parts.Originality/value: This research was the first to consider pre-processing in batch scheduling. | |
| 653 | |a Scheduling | ||
| 653 | |a Mathematical models | ||
| 653 | |a Learning | ||
| 653 | |a Batch processing | ||
| 700 | 1 | |a Rinto Yusriski | |
| 700 | 1 | |a Isnaini, Mohammad Mi'radj | |
| 700 | 1 | |a Ma'ruf, Anas | |
| 700 | 1 | |a Abdul Hakim Halim | |
| 773 | 0 | |t Journal of Industrial Engineering and Management |g vol. 17, no. 2 (2024), p. 542 | |
| 786 | 0 | |d ProQuest |t ABI/INFORM Global | |
| 856 | 4 | 1 | |3 Citation/Abstract |u https://www.proquest.com/docview/3085231130/abstract/embedded/L8HZQI7Z43R0LA5T?source=fedsrch |
| 856 | 4 | 0 | |3 Full Text - PDF |u https://www.proquest.com/docview/3085231130/fulltextPDF/embedded/L8HZQI7Z43R0LA5T?source=fedsrch |