Solving multi-scenario hybrid flow shop scheduling problem based on an improved probe machine model

Furkejuvvon:
Bibliográfalaš dieđut
Publikašuvnnas:PLoS One vol. 20, no. 9 (Sep 2025), p. e0330020
Váldodahkki: Tian, Xiang
Eará dahkkit: Kong, Yang, Liu, Xiyu
Almmustuhtton:
Public Library of Science
Fáttát:
Liŋkkat:Citation/Abstract
Full Text
Full Text - PDF
Fáddágilkorat: Lasit fáddágilkoriid
Eai fáddágilkorat, Lasit vuosttaš fáddágilkora!
Govvádus
Abstrákta:The hybrid flow-shop scheduling problem is widely present and applied in industries such as production, manufacturing, transportation, and aerospace. In recent years, due to the advantages of nonlinear access and fully parallel processing, the probe machine has shown powerful computing capabilities and promising applications in solving various combinatorial optimization problems. This work firstly proposes an Improved Probe Machine with Multi-Level Probe Operations (IPMMPO) and ingeniously designs general data libraries and probe libraries tailored for multi-scenario HFS problems, including HFS with identical parallel machines and HFS with unrelated parallel machines, no-wait scenario, and standard scenario. Secondly, based on the data libraries of the IPMMPO, two tuple sets suitable for constraint programming modeling are further designed as data preprocessing. Next, a CP model (IPMMPO-CP) applicable to multi-scenario HFS problems is proposed. Finally, based on a large number of instances and real cases, IPMMPO-CP is compared with 9 representative algorithms and 2 latest CP models. The results demonstrate that the proposed IPMMPO-CP outperforms the compared algorithms and models.
ISSN:1932-6203
DOI:10.1371/journal.pone.0330020
Gáldu:Health & Medical Collection