An improved hybrid model for the generic hoist scheduling problem

محفوظ في:
التفاصيل البيبلوغرافية
الحاوية / القاعدة:Annals of Operations Research vol. 115, no. 1 (Sep 2002), p. 173
المؤلف الرئيسي: Riera, Daniel
مؤلفون آخرون: Yorke-Smith, Neil
منشور في:
Springer Nature B.V.
الموضوعات:
الوصول للمادة أونلاين:Citation/Abstract
Full Text
Full Text - PDF
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
الوصف
مستخلص:The generic hoist scheduling problem is NP-hard and arises from automated manufacturing lines. In recent work using the constraint logic programming (CLP) formalism, a unified model has been developed with the problem description and solution method separated. We provide an improved model and new preprocessing stages where, as before, solutions and proof of optimality are provided by a hybrid CLP-MIP algorithm. The new algorithm is more scalable and robust. We give empirical results for a range of problem classes on benchmark problems from several sources. [PUBLICATION ABSTRACT]
تدمد:0254-5330
1572-9338
المصدر:ABI/INFORM Global