An improved hybrid model for the generic hoist scheduling problem
محفوظ في:
| الحاوية / القاعدة: | Annals of Operations Research vol. 115, no. 1 (Sep 2002), p. 173 |
|---|---|
| المؤلف الرئيسي: | |
| مؤلفون آخرون: | |
| منشور في: |
Springer Nature B.V.
|
| الموضوعات: | |
| الوصول للمادة أونلاين: | Citation/Abstract Full Text Full Text - PDF |
| الوسوم: |
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
| مستخلص: | The generic hoist scheduling problem is NP-hard and arises from automated manufacturing lines. In recent work using the constraint logic programming (CLP) formalism, a unified model has been developed with the problem description and solution method separated. We provide an improved model and new preprocessing stages where, as before, solutions and proof of optimality are provided by a hybrid CLP-MIP algorithm. The new algorithm is more scalable and robust. We give empirical results for a range of problem classes on benchmark problems from several sources. [PUBLICATION ABSTRACT] |
|---|---|
| تدمد: | 0254-5330 1572-9338 |
| المصدر: | ABI/INFORM Global |