An improved hybrid model for the generic hoist scheduling problem
Guardado en:
| Udgivet i: | Annals of Operations Research vol. 115, no. 1 (Sep 2002), p. 173 |
|---|---|
| Hovedforfatter: | |
| Andre forfattere: | |
| Udgivet: |
Springer Nature B.V.
|
| Fag: | |
| Online adgang: | Citation/Abstract Full Text Full Text - PDF |
| Tags: |
Ingen Tags, Vær først til at tagge denne postø!
|
| Resumen: | The generic hoist scheduling problem is NP-hard and arises from automated manufacturing lines. In recent work using the constraint logic programming (CLP) formalism, a unified model has been developed with the problem description and solution method separated. We provide an improved model and new preprocessing stages where, as before, solutions and proof of optimality are provided by a hybrid CLP-MIP algorithm. The new algorithm is more scalable and robust. We give empirical results for a range of problem classes on benchmark problems from several sources. [PUBLICATION ABSTRACT] |
|---|---|
| ISSN: | 0254-5330 1572-9338 |
| Fuente: | ABI/INFORM Global |