An improved hybrid model for the generic hoist scheduling problem

Zapisane w:
Opis bibliograficzny
Wydane w:Annals of Operations Research vol. 115, no. 1 (Sep 2002), p. 173
1. autor: Riera, Daniel
Kolejni autorzy: Yorke-Smith, Neil
Wydane:
Springer Nature B.V.
Hasła przedmiotowe:
Dostęp online:Citation/Abstract
Full Text
Full Text - PDF
Etykiety: Dodaj etykietę
Nie ma etykietki, Dołącz pierwszą etykiete!
Opis
Streszczenie:The generic hoist scheduling problem is NP-hard and arises from automated manufacturing lines. In recent work using the constraint logic programming (CLP) formalism, a unified model has been developed with the problem description and solution method separated. We provide an improved model and new preprocessing stages where, as before, solutions and proof of optimality are provided by a hybrid CLP-MIP algorithm. The new algorithm is more scalable and robust. We give empirical results for a range of problem classes on benchmark problems from several sources. [PUBLICATION ABSTRACT]
ISSN:0254-5330
1572-9338
Źródło:ABI/INFORM Global